Combined Cycle Project 50

Overview

Consisting of Medium Voltage, Cooling Tower, Steam Turbine Generator, Raw Water and Heat Recovery Steam Generator Enclosures.

  • 30’ W x 70’ L 6.9kV Electrical Control Room with (19) Sections of 6.9kV MV Switchgear, (6) Sections of 6.9kV MV MCCs, (5) Sections of LV Switchgear, UPS and DC System, 3000A Non Seg Bus Duct Tie Run, DCS Cabinets, Relay Panels, SCADA Cabinets, Network Cabinet, Switchboards, Panelboards, and Transformers
  • 15’ W x 48’ L Cooling Tower Electrical Control Room with (12) Sections of 480 LV Switchgear, LV Bus Duct, Switchboards, HRG Systems, Network Cabinet, Panelboards, and Transformers.
  • (2) 15’ W x 24’ L HRSGs Enclosure with 480 Volt MCCs, DCS Cabinets, Network Cabinet, Switchboards, Panelboards and Transformers.
  • 15’ W x 21’ L Raw Water Enclosure with 480 Volt MCCs, DCS Cabinets, Network Cabinet, Panelboards and Transformers.
  • Shipped Loose equipment including SUS Transformers, LV Non Seg Bus Duct, LV Switchgear and Low Voltage MCCs.

Location

Pennsylvania

Combined Cycle Project 51

View Next Project