Combined Cycle Project 49

Overview

Consisting of Medium Voltage, Cooling Tower, and Heat Recovery Steam Generator Enclosures and Water Treatment control equipment.

  • 28’ W x 55’ L 6.9kV Electrical Control Room with (14) Sections of 6.9kV Arc Resistant Switchgear, (6) Sections of 6.9kV Arc Resistant MCCs, 3000A Non Seg Bus Duct Tie Run, (4) DCS Cabinets, (3) Relay Panels, (2) SCADA Cabinets, Network Cabinet, Panelboards, and Transformers
  • 23’ W x 53’ L Cooling Tower Electrical Control Room with (12) Sections of 480V Arc Resistant Switchgear, (14) sections of LV MCCs, (3) DCS Cabinets, (4) HRG Systems, UPS Battery System, Panelboards, and Transformers.
  • 24’ W x 40’ L Heat Recovery Steam Generator Enclosure with (5) Sections of 480V Arc Resistant Switchgear, (10) Sections of LV MCCs, (2) HRG Systems, (4) DCS Cabinets, Battery System, Panelboards and Transformers.
  • Shipped Loose equipment including (7) SUS Transformers, (8) runs of Non Seg Bus Duct, (3) Cable Bus Runs, and (10) Sections of LVMCCs.

Location

Pennsylvania