Combined Cycle Project 42

Overview

Consisting of Medium Voltage, Shared Services, Auxiliary Cooling Condenser, Heat Recovery Steam Generator enclosures and loose shipped power transformers.

  • 45’ W x 80’ L, MV Electrical Control Room (6 piece) with (42) Sections of 5 kV Arc Resistant Switchgear, (8) Sections of 480 Volt Switchgear, 16 sections of LVMCC, (2) 3750kVA Power Transformers, (6) DCS Cabinets, Fire Alarm System, Panelboards, Transformers and 5 kV and 600 Volt Bus Duct.
  • 45’ W x 52’L Shared Services Electrical Control room with 7 sections of 480 Volt Switchgear, 26 sections of LV MCCs, (2) 3750/5000 kVA Power Transformers, DC Battery System, (4) DCS Cabinets, Fire Alarm System, Panelboards, Transformers and 600 Volt Bus Duct.
  • (3) 15’ W x 49’ L ACC Electrical Control Room with 48 sections of LV MCCs, (3) DCS Cabinets, Fire Alarm System, Security Panel, Panelboards, and Transformers.
  • (3) 15’ W x 54’ L HRSG Electrical Control Room each with (5) sections of 480 Volt Switchgear, 18 sections of LV MCCs, (2) 2500kVA Power Transformers (6) DCS Cabinets, Vibration Panel, BMS Panel, Telecom Racks, Fire Alarm System, Panelboards and Transformers.
  • Ship Loose Equipment: (12) Aux 2500/3333 kVA Transformers, 600 Volt Bus Duct, (4) Lineups of LV MCCs and Misc Panelboards.
  • Non Segregated Bus Duct for Excitation Equipment

Location

Pennsylvania